Effective April 1, 2026, Blachly-Lane electric service rates are as follows:
Monthly Rate
Distribution Capacity Charge (per meter):
- Single-phase $40.47
- Three-phase $46.02
Distribution Services Charge:
- Single and Poly Phase $18.53
(Only applies to the first meter on an account at the same service location)
kWh Usage Charge:
- 0-2000 kWh per month at $ 0.1119
- Over 2000 kWh per month $ 0.1288
Monthly Rate
Distribution Capacity Charge (per meter):
- C-1 Single Phase $44.01
- C-1 Poly Phase $49.60
Distribution Services Charge
- C-1 Single and Poly Phase $20.15
(Only applies to the first meter on an account at the same service location)
kWh Usage Charge
- 1-2000 kWh per month $ 0.0629
- Over 2000 kWh per month $ 0.0818
Monthly Rate
Distribution Charges:
- Distribution Capacity Charge $ 146.02
Power Supply Charges:
- Demand per kW $ 11.10
- All months per kWh $ 0.0422
Monthly Rate
Distribution Charges:
- Distribution Capacity Charge $ 221.00 Per month
Power Supply Charges:
- Demand $ 12.47 Per kilowatt of billing demand
- All months $ 0.0522 Per kilowatt hour
Monthly Rate
Distribution Charges:
- Distribution Capacity Charge $ 605.21 Per month
Power Supply Charges:
- Demand $ 11.87 Per kilowatt of billing demand
- All months $ 0.0576 Per kilowatt hour
Monthly Rate
Distribution Charges:
- Distribution Capacity Charge $ 605.21 Per month
Power Supply Charges:
- Demand $ 12.94 Per kilowatt of billing demand
- All months $ 0.0707 Per kilowatt hour
Type of Service
On a voluntary basis, consumers may support the continuing operations of such plants as the Coffin Butte Landfill Methane Resource Project and promote the expansion of this type of alternative energy source. At the consumer’s request, the Cooperative will direct an additional dollar amount on their electric bill to help fund the production of Green Power from the Coffin Butte Landfill Methane Resource Project.
Monthly Support Charges (Over and Above the Applicable Rate)
- 100 kWh blocks at $2.00 per block
- 1000 kWh blocks at $15.00 per block
- 100 watts High Pressure Sodium or Equivalent $15.85
- 200 watts High Pressure Sodium or Equivalent $28.98
- 400 watts High Pressure Sodium or Equivalent $47.07
Availability
Available to all customers with a qualifying contractual generating resource up to and including 25 kW or a net metered service resulting in a net metered flow of 25 kW maximum into BLEC’s system, at any time.
Type of Service
Available to all services BLEC offers.
Monthly Rate
Customer shall pay the Electric System Charge as classified in their rate schedule, and any other charges as specified in the appropriate rate class they are classified in.
Terms of Payment
The above rates are net. Penalties will be assessed in accordance with established rules and regulation.
Avoided Costs
For the purpose of calculating the avoided cost in crediting a net metering customer, the Cooperative shall use the projected avoided wholesale cost of power. The avoided cost will be paid to the customer for any energy flowing into BLEC’s system net of all other flows for the month.
| Year | Jan | Feb | Mar | April | May | June | July | Aug | Sept | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026 | 43.18 | 37.90 | 30.36 | 23.54 | 22.60 | 27.19 | 40.40 | 47.15 | 48.16 | 41.34 | 44.11 | 49.83 |
Note: To non-residential consumers establishing new service, to confirm the rate class and costs associated with your unique service needs you must provide Blachly-Lane specific information on your planned service and consumption requirements. Please call our engineering department at (541) 688-8711 for additional information.