As part of our strategic plan, Blachly-Lane Electric Cooperative is upgrading the electric meters across our service territory. The new meter installation will begin with a smaller initial rollout in the summer of 2026 and will be completed in 2027. This FAQ is part of a broader information campaign and answers the questions we most often hear from members about meter changes. It covers what the new meters are, what to expect on the day of installation, how the upgrade affects your bill, how your data is handled, and what to do if you have questions or concerns not answered here.

About the project

Who is doing the installations?

Blachly-Lane crews will perform all meter installations. This process is not being contracted out. The people visiting your property for this project will be cooperative employees in marked vehicles.

Communications

We are committed to keeping members informed about this project every step of the way. In addition to this FAQs page, we are sharing this information broadly with members using emails and postcards. Last, members in each area will be notified directly with an automated phone message when work is estimated to begin in their area.

When will this happen in my area?

The upgrade is rolling out in two phases. In summer of 2026, we are replacing 258 meters in the Indian Creek area, our most remote section of the system. In 2027, we will replace the remaining meters across the rest of the system, about 3,456 meters.

What meter is being installed?

The new meter will replace your old meter on a one for one basis in the same meter socket on the outside of your home or business. The new meter uses a Tantalus communication module; the meter itself is sourced from one of several manufacturers the cooperative works with.

Why is Blachly-Lane making this change now?

Our current AMR system is at the end of its useful life. The equipment we use to read and program the meters has been discontinued by the manufacturer, replacement parts are going away, and we are seeing an uptick in AMR meter failures. Making this change now, on a planned schedule, is more responsible to the membership than waiting for the old system to fail.

What is AMI?

AMI stands for Advanced Metering Infrastructure. It is the most commonly used type of electric meter. Like our current Automated Meter Reading (AMR) meters, AMI meters read themselves and send the reading back to the cooperative by radio. The difference is that AMI meters connect through a network of nearby meters rather than being read one at a time by a truck driving past. That network lets us collect reads more often, more reliably, and with better information during outages.

Your meter installation

What if something stops working after the installation?

Call the office. The new meter does not connect to the wiring inside your home and should not affect the function of your appliances. If you do notice something unusual after the new meter installation, we want to hear about it so we can look into it.

Who will be on my property?

A Blachly-Lane crew in a marked cooperative vehicle. If you are ever unsure whether a person at your meter is from the cooperative, please call the office before letting them proceed.

Will my power go out?

Yes, briefly. Because the old meter has to be pulled out of the socket and the new one inserted, your power will be off for the length of the swap, generally under 15 minutes.  Consider saving work frequently on computers, checking on any electronics that are sensitive to power interruptions, and planning around any equipment that needs continuous power.

Your bill

Will I be able to see my own usage data?

The cooperative is looking into what it will take to implement this. We will share more if and when there is something to share. Please let us know if this is something you are interested in.

Does this mean the end of estimated bills?

In most cases, yes. Under the current AMR system, we sometimes have to estimate a reading and true it up later when the meter is reachable. AMI reads are more reliable, so estimated bills should become uncommon.

Will my bill go down because of this upgrade?

Your bill reflects your usage. What AMI does give both you and the cooperative is a more accurate picture of that usage, which ends estimated reads and makes it easier to spot unusual consumption early.

Will my bill go up because of this upgrade?

The meter replacement does not result in a separate charge to your account. Your electric bill continues to be based on the kilowatt-hours you use at the rates approved by the Board. Like other system investments, this work is included as part of the Cooperative’s long-term capital planning to maintain reliable electric service.

Privacy and data

How long is my data kept?

Usage data is retained in accordance with the cooperative’s records retention policy and applicable Oregon law.

What data does the new meter collect?

The new meters measure your electricity use in the same way your current meter does. That is the same measurement your existing meter takes. In addition, the new meters can record the date and time of power outages and blinks.

Health and safety

Is the meter installed inside my home?

In most cases the meter is installed in the existing meter socket on the outside of your home or business. A small number of meters are located in other places, such as a garage or basement. The new meter goes in the same location as your current one.

Are the new meters safe?

Yes. The meter is certified to U.S. Federal Communications Commission (FCC) limits for radio frequency (RF) emissions. The radio in an AMI meter operates at a very low power level and transmits only for fractions of a second at a time, generally totaling a few seconds of transmission per day.

Meter accuracy and remote capability

Will Blachly-Lane use the remote disconnect on my service?

AMI does not change the circumstances under which service may be disconnected.  What the remote capability does give us is faster service restoration once a disconnect condition is resolved, and the ability to activate or deactivate service at a move-in or move-out without a separate truck roll.

How do I know the new meter is accurate?

All new meters are tested and certified before installation. The new advanced meter meets or exceeds the ANSI accuracy standard used across the U.S. electric industry.

Opt-out

Why is the cooperative not offering an opt-out?

Four reasons, taken together:

  1. The equipment we use to read and program our current AMR meters has been discontinued by the manufacturer. Once that equipment fails, we will not be able to maintain AMR meters on the system.
  2. AMR meter failures are already increasing. Continuing to rely on AMR meters past the transition would put accurate billing at risk for the whole membership.
  3. Blachly-Lane operates with a small workforce. Maintaining a parallel AMR system alongside AMI indefinitely would pull crews off reliability work, outage response, and system maintenance, which serves every member.
  4. Maintaining two parallel meter systems adds cost that the entire membership pays. The cooperative would need to keep AMR vendor support, programming tools, and staff training in place even as AMR resources are disappearing in the industry.

Questions for specific kinds of accounts

I have a cabin or a seasonal residential property. Does anything change?

The crew can replace the meter whether or not the property is occupied at the time. Notifications will still go to your current phone number or billing address. If the property has access restrictions (gates, bridges, seasonal roads), please call the office after you receive a notice of when we plan to be in your area.

I have irrigation service. Does anything change for me?

The meter on an irrigation service is upgraded the same as any other meter. Because irrigation loads are seasonal and summer consumption is high, accurate reads are especially useful on these accounts. If your service is in an out of season condition at the time we reach your area, please call the office so we can coordinate the installation window.